Project consisted of: addition of a dormer and finishing the attic space into a master suite. New master bathroom has been installed and tiled with porcelain and marble. Japanese sliding doors have been used to enclose storage areas. Painting, installation of new hardwood floors, installation of new decorative trim work throughout the third floor as well as New electrical, plumbing and HVAC systems for the third floor. New large diameter copper water lines from the basement and hot water recirculation system. New Marvin Windows. This project was featured in Better Homes and Gardens Magazine! Look for other Leader Builders projects that have been published or won the awards.